Current Eminent Domain Projects

Howard to Solstice 765kV Transmission Line
CPS Energy and AEP Texas received approval from the Public Utility Commission of Texas to build the Howard to Solstice 765 kV Transmission Line, a new extra-high-voltage line connecting CPS

Dinosaur to Longshore 765kV Transmission Line
Oncor Electric Delivery Company received approval from the Public Utility Commission of Texas to build the Dinosaur to Longshore 765 kV Transmission Line, a new extra-high-voltage line in West Texas.

Longshore to Drill Hole 765kV Transmission Line
Oncor Electric Delivery Company received approval from the Public Utility Commission of Texas to build the Longshore Switch to Drill Hole Switch 765 kV Transmission Line, one of the earliest

El Capitan to Dry Lake 345kV Transmission Line
Oncor Electric Delivery Company received approval from the Public Utility Commission of Texas to build the El Capitan to Dry Lake 345 kV Transmission Line, a double-circuit line connecting Oncor’s

Dry Lake to Faulkner 345kV Transmission Line
Oncor Electric Delivery Company and Texas-New Mexico Power Company (TNMP) received approval from the Public Utility Commission of Texas to build the Dry Lake to Faulkner 345 kV Transmission Line,

Grand Prix Pipeline (Speedway Pipeline)
The Grand Prix Pipeline, also known as the Speedway Pipeline, is a large-scale natural gas liquids system owned and operated by Targa Resources. It transports products such as propane and butane from